Burlington Renewable Energy Projects
Timeline: 2016 onwards. In 2018, there were almost 7MW (megawatts) of installed solar capacity in Burlington. In 2023, based on data from Burlington Hydro, this increased to just under 9 MW. In 2022,…
Clean Air Partnership is now Climate Action Partnership
Timeline: 2016 onwards. In 2018, there were almost 7MW (megawatts) of installed solar capacity in Burlington. In 2023, based on data from Burlington Hydro, this increased to just under 9 MW. In 2022,…
Timeline: 2014 onwards The City of Burlington has approximately 300 fleet assets, ranging from light-duty to heavy-duty vehicles, with Automatic Vehicle Location (AVL) systems. The City uses a divers…
The City of Burlington owns and operates a fleet of over 353 vehicles. Each of the City’s fleet Operating Groups, Fire Department and Transit Department use a mix of vehicles such as Cars/Minivans/SUV…
Timeline 2024 onwards The City of Burlington added four electric ice resurfacers to its fleet in 2024. Half of the City’s ice resurfacers are electric and the City is planning to replace all existing…
Timeline: 2010 onwards City View Park is nestled within the Niagara Escarpment Biosphere Reserve in Burlington, Ontario. As such, the park’s master plan has a more natural design than typical city par…
Timeline: 2021 onwards In 2021, the Joseph Brant Museum received LEED Platinum certification. It has a heat pump system connected to a geo-exchange field located under the parking lot and a green roof…